THE SOLUTION
Working closely with Pilot Pen and our installation partners, ARC designed and delivered a five-workstream programme that replaced every element of the old gas infrastructure, added a market-leading solar PV system, and left the building redecorated throughout.
Rather than recommending a like-for-like gas replacement, we designed the heating system around infrared technology - the most comfortable, efficient, and environmentally responsible solution for this type of building. Working in the same way as the sun, infrared heat is directed down to occupants without heating the surrounding air, meaning energy is used only where and when it's needed.
Throughout the offices, communal areas, and toilet facilities, we installed ETHERMA LAVA in-ceiling infrared panels. These long-wave panels heat objects, surfaces, and people directly rather than warming the air, retaining heat within walls, floors, and furniture for long-lasting comfort. Frameless and unobtrusive, they were installed without any demolition works and require zero maintenance.
In the warehouse, we installed ETHERMA EEZ medium-wave radiant ceiling heaters, specifically engineered for large industrial spaces with high ceilings. Rather than attempting to heat the entire warehouse volume, we used targeted spot and zone heating - controlled by PIR occupancy sensors and individual temperature setpoints - to heat only the areas where staff are working. The result is that just 14% of the warehouse floor area is actively heated at any time, delivering worker comfort without wasting energy on unoccupied space.